ABSTRACT
It has become a regular occurrence nowadays in which we find the project final cost that will overrun the contract sum originally set in contract document due to negligence in the part of the architect and the building professionals to provide enough drawings and information at both the pre-contract and post contract stage it is in light of this that we take up this research with title the influence of contract drawing on building project.
Research hypothesis was postulated and tested in the work using the chi square method.
This research has shown that The number of contract drawings used has effect on the building project final cost and that The number of contract drawings used has significant effect on the time overrun of a building project.
ABSTRACT
This project research was aimed at examining the effectiveness of ICT on teaching and learning, case study on b...
Background of the study
Manufacturing businesses are shifting their focus toward three primary competitive areas...
BACKGROUND TO THE STUDY
Teachers occupy a every important position in the educational system of any country because it...
Background Of The Study
The truism that bribery and corruption are the surest way to impede the develop...
Background of study
Home movies are valued as a means of mass communication all over the world....
ABSTRACT
This Project Design and Implementation of Orientation Camp Information System (A Case Study of...
ABSTRACT
It has been observed that studies on insurgency in Nigeria have in the most parts been anchored on politics, law, economy, the e...
ABSTRACT
This study investigated the influence of school supervision on the implementation of commerce curriculum in Senior Secondary Sch...
ABSTRACT
This study was on oxidative stress status of rat fed with Pentraclethra macrophylla, otherwise known as African oil bean seed oi...
Abstract
Evidence abounds of Nigeria’s quest for a permanent seat in the United Nations Security Council