ABSTRACT
It has become a regular occurrence nowadays in which we find the project final cost that will overrun the contract sum originally set in contract document due to negligence in the part of the architect and the building professionals to provide enough drawings and information at both the pre-contract and post contract stage it is in light of this that we take up this research with title the influence of contract drawing on building project.
Research hypothesis was postulated and tested in the work using the chi square method.
This research has shown that The number of contract drawings used has effect on the building project final cost and that The number of contract drawings used has significant effect on the time overrun of a building project.
Chapter One: Introduction
1.1 Background of the Study
Electoral processes are central to the functioning of democratic systems,...
Background of the study
Online code mixing, the blending of elements from two or more languages in communication, is increasingly promine...
Abstract
Automobiles are integral in today’s society as they are used for transportation, commerce, and public services. The ubiqui...
Background of the Study
Urban infrastructure—including transportation networks, utilities, and communication systems&...
Background of the Study
Person-centered care (PCC) is a healthcare approach that prioritizes the preferences, values, and needs of patien...
Hypertension is a leading risk factor for cardiovascular diseases, and its pr...
ABSTRACT
This thesis examines students' and parents' views on Arabic education in Lagos State,...
Chapter One: Introduction
Background of the Study
In the construction industry, accurate cost estimation is essential to ensure...
Background of the Study
Patient satisfaction is a critical indicator of healthcare quality, reflecting...
Background of the Study
Robotics is a multidisciplinary field that combines principles from engineering, mathematics, an...