ABSTRACT
It has become a regular occurrence nowadays in which we find the project final cost that will overrun the contract sum originally set in contract document due to negligence in the part of the architect and the building professionals to provide enough drawings and information at both the pre-contract and post contract stage it is in light of this that we take up this research with title the influence of contract drawing on building project.
Research hypothesis was postulated and tested in the work using the chi square method.
This research has shown that The number of contract drawings used has effect on the building project final cost and that The number of contract drawings used has significant effect on the time overrun of a building project.
ABSTRACT
This study investigated men involvement in ante-natal care using Ikeja bag Local Government as...
Background to the study
Socio-economic background or status refers to a person’s position in a given group, societ...
ABSTRACT
Just as every sector of the economy is eager to improve her condition through various research work, it is...
Abstract
The research was undertaken to justify the effectiveness or otherwise of counseling services in sokoto metropo...
ABSTRACT
Linguistic stylistic analysis of the language of poets investigates the use of language in literature especiall...
ABSTRACT
This study was carried out to examine parental academic background and primary school pupils&r...
ABSTRACT
This study was carried out to examine the influence of inadequate information technology on academic performanc...
ABSTRACT
Bauhinia rufescens Lam (Caesalpinioidae) is a scandent shrub or small tree measuring between 1-3m high but sometimes up to 8m hi...
Background Of The Study
Agbada (2019) maintained that education is the constant restructuring of experi...
Abstract
The research sought to find out the perception of students towards Mathematics and how it affects their academic attainment in a...